Justia Utilities Law Opinion Summaries
Articles Posted in Energy, Oil & Gas Law
Idaho Power Co. v. FERC
IDACORP submitted proposed settlements to FERC involving the FERC proceeding related to electricity sales in the Pacific Northwest in 2000 and 2001. At issue was whether FERC abused its discretion in considering these proposed settlements. The court concluded that the
agency departed from its rules and precedent without explanation when it treated the first proposed settlement as uncontested. In this case, FERC abused its discretion by foregoing the Trailblazer Pipeline Co. analysis and merits analysis dictated by FERC’s regulations. The court granted both petitions for review and remanded for further proceedings because the settlements and petitions are inextricably intertwined. View "Idaho Power Co. v. FERC" on Justia Law
Posted in:
Energy, Oil & Gas Law, Utilities Law
Pioneer Trail Wind Farm, LLC v. Fed. Energy Regulatory Comm’n
MISO, an organization of independent transmission-owning utilities, has linked the transmission lines of its members into a single interconnected grid across 11 states. The Generators, which operate 150-megawatt wind-powered electric generation facilities in Illinois, wish to connect to the system run by MISO. The Federal Energy Regulatory Commission (FERC), acting under 16 U.S.C. 824(a), has standardized the process: the Generators submitted requests to MISO, which then produced studies (paid for by the Generators) to assess potential impact on the grid and calculate the cost of necessary upgrades. After the studies were complete and agreements signed, MISO notified the Generators of a “significant error” that failed to include certain upgrades and that the Generators would either have to agree to fewer megawatts or pay for additional upgrades estimated to cost $11.5 million. MISO presented superseding Agreements to both Generators. The companies refused to sign. FERC found that the Generators should pay for the additional network upgrades. The Seventh Circuit denied a petition for review. The record failed to show that the Generators relied on the original, mistaken studies or that reducing the output would have made their farms economically unsustainable. They also had an exit option. The court noted that the Generators apparently built their wind farms despite the dispute. View "Pioneer Trail Wind Farm, LLC v. Fed. Energy Regulatory Comm'n" on Justia Law
NRU V. FERC
Petitioners, wholesale electricity customers, challenged FERC's orders requiring the Bonneville Power Administration to provide transmission services on terms "not unduly discriminatory or preferential." Petitioners are wholesale electricity customers of Bonneville. The court concluded that petitioners have Article III standing by demonstrating that they have an injury in fact, causation, and redressability. The court concluded, however, that petitioners failed to demonstrate statutory standing, which requires them to be "aggrieved" within the meaning of the Federal Power Act section 313(b) (FPA), 16 U.S.C. 8251(b), and the Administrative Procedure Act section 10, 5 U.S.C. 702. In this case, the zone-of-interests test was not satisfied where petitioners' interests are not arguably protected by section 211A of the FPA. Accordingly, the court denied the petitions for review. View "NRU V. FERC" on Justia Law
Posted in:
Energy, Oil & Gas Law, Utilities Law
NRU V. FERC
Petitioners, wholesale electricity customers, challenged FERC's orders requiring the Bonneville Power Administration to provide transmission services on terms "not unduly discriminatory or preferential." Petitioners are wholesale electricity customers of Bonneville. The court concluded that petitioners have Article III standing by demonstrating that they have an injury in fact, causation, and redressability. The court concluded, however, that petitioners failed to demonstrate statutory standing, which requires them to be "aggrieved" within the meaning of the Federal Power Act section 313(b) (FPA), 16 U.S.C. 8251(b), and the Administrative Procedure Act section 10, 5 U.S.C. 702. In this case, the zone-of-interests test was not satisfied where petitioners' interests are not arguably protected by section 211A of the FPA. Accordingly, the court denied the petitions for review. View "NRU V. FERC" on Justia Law
Posted in:
Energy, Oil & Gas Law, Utilities Law
Pac. Gas & Elec. Co. v. Pub. Util. Comm’n
Under Pub. Util. Code 1701(a)1, the Public Utilities Commission (PUC ) promulgated Rule 1.1, stating: Any person who . . . transacts business with the Commission . . . agrees . . . never to mislead the Commission or its staff by an artifice or false statement of fact or law. After a massive 2010 explosion of an underground gas pipeline owned and operated by Pacific Gas and Electric (PG&E), the PUC imposed reforms, including requiring that PG&E improve its recordkeeping and information technology capabilities. PG&E was directed to keep the PUC informed of any reported pipeline leaks and any discovered information regarding the safety of pipeline operations. Following discovery of a pipeline leak, PG&E also discovered that some information it had provided to the PUC concerning the internal pressure at which certain pipelines could be safely operated might not be correct. About seven months after internally verifying the information, PG&E, communicated to the PUC via a written “Errata”‖ to a previous filing. Following extensive hearings, the PUC deemed this filing both a substantive and a procedural violation and imposed civil penalties totaling $14,350,000. The court of appeal affirmed, finding that the penalties were not grossly disproportional to the gravity of PG&E‘s tardiness. View "Pac. Gas & Elec. Co. v. Pub. Util. Comm'n" on Justia Law
Posted in:
Energy, Oil & Gas Law, Utilities Law
Turlock Irrigation Dist. v. FERC
The Districts and the Trust petitioned for review of FERC's order determining that the La Grange Hydroelectric Project fell within the mandatory licensing provisions of the Federal Power Act, 16 U.S.C. 817(1). Because the Trust has failed to establish standing either
for itself or on behalf of its members, the court dismissed its petition for lack of jurisdiction. As to the merits of the Districts' arguments, the court concluded that FERC’s evidence of actual use in the past, together with current use of the Tuolumne River by California DFG crews, constitutes substantial evidence supporting FERC’s finding that La Grange is located on a navigable water of the United States; FERC properly relied on the results of its backwater analysis to conclude that the La Grange reservoir extends onto federal lands; and the Districts' challenges to FERC's finding that the La Grange Project is subject to FERC's mandatory licensing jurisdiction based on Congress's "authority to regulate commerce with foreign nations and among the several States" are without merit. Accordingly, the court denied the petition, concluding that FERC's jurisdictional determinations were supported by substantial evidence and reached by reasoned decisionmaking. View "Turlock Irrigation Dist. v. FERC" on Justia Law
Davis v. Southern Cal. Edison
This appeal stemmed from plaintiff's applications to SCE to interconnect solar generating systems to the SCE electricity grid to generate electricity for use on plaintiff's properties and to sell to SCE. At issue is the potential conflict between Public Utilities Code section 1759,2 which limits jurisdiction to review an order of the PUC to the Court of Appeal and the Supreme Court, and section 2106, which grants jurisdiction to the superior court to hear actions for damages against a public utility that violates California law. The court concluded that the trial court correctly held that the PUC had exclusive jurisdiction over plaintiff’s claims under its Supreme Court’s holding in San Diego Gas & Electric Co. v. Superior Court because adjudication of plaintiff’s claims would “‘hinder or frustrate the commission’s declared supervisory and regulatory policies’” with respect to interconnection of solar generating facilities under Rule 21, Rule 16 and the California Renewable Energy Small Tariff (CREST) and Net Energy Metering (NEM) programs. To the extent plaintiff has viable damage claims following the PUC’s adjudication of his administrative complaints currently pending before the PUC, those claims will only become ripe for filing in the trial court once the PUC reaches a final decision. The court affirmed the judgment. View "Davis v. Southern Cal. Edison" on Justia Law
Posted in:
Energy, Oil & Gas Law, Utilities Law
People of State of Cal. v. FERC
In 2004, the Ninth Circuit decided California ex rel. Lockyer v. FERC, which held that FERC may authorize market-based energy tariffs so long as that regulatory framework incorporates both an ex ante market power analysis and enforceable post-approval transaction reporting. In the instant case, Petitioners, the people of the state of California and related parties, sought review of a series of orders issued by the Federal Energy Regulatory Commission (FERC) on remand following the Court’s decision in Lockyer, arguing that FERC failed to follow Lockyer and violated the Federal Power Act by requiring proof of excessive market share as a necessary condition for relief for transaction reporting violations. The Ninth Circuit granted the petition for judicial review, holding that FERC structured the remand proceedings in a manner contrary to the terms of the Lockyer decision. Remanded to FERC for further proceedings. View "People of State of Cal. v. FERC" on Justia Law
Myersville Citizens for a Rural Community, Inc. v. Fed. Energy Regulatory Comm’n
Citizens of Myersville, in Frederick County, Maryland, oppose the construction of a natural gas facility called a compressor station in their town as part of a larger expansion of natural gas facilities in the northeastern United States proposed by Dominion, a regional natural gas company. The Federal Energy Regulatory Commission, over the objections of the citizens, conditionally approved it. Dominion fulfilled the Commission’s conditions, including obtaining a Clean Air Act permit from the Maryland Department of the Environment. Dominion built the station, and it has been operating for approximately six months. The D.C. Circuit denied a petition for review, rejecting arguments that the Commission lacked substantial evidence to conclude that there was a public need for the project; that the Commission unlawfully interfered with Maryland’s rights under the Clean Air Act; that environmental review of the project, including its consideration of potential alternatives, was inadequate; and that the Commission unlawfully withheld hydraulic flow diagrams from them in violation of their due process rights. View "Myersville Citizens for a Rural Community, Inc. v. Fed. Energy Regulatory Comm'n" on Justia Law
New York v. Fed. Energy Regulatory Comm’n
The Federal Energy Regulatory Commission (FERC) has regulatory authority over interstate aspects of the nation’s electric power system, but not over “facilities used in local distribution or only for the transmission of electric energy in intrastate commerce,” 16 U.S.C. 824(a). FERC entered orders adopting standards and procedures for determining which power distribution facilities are subject to the agency’s regulatory jurisdiction and which facilities fall within the statutory exception for local distribution of electric energy. The state and the Public Service Commission of the State of New York challenged the standards and procedures as an unreasonable interpretation of the agency’s statutory grant of jurisdiction and as arbitrary and capricious under the Administrative Procedure Act. The Second Circuit upheld the orders as reasonably interpreting the agency’s regulatory jurisdiction under the Federal Power Act as amended by the Electricity Modernization Act of 2005 and supported by sufficient explanation and substantial evidence as required by the Administrative Procedure Act. View "New York v. Fed. Energy Regulatory Comm'n" on Justia Law